We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Privacy Policy.
  • TOPICS
    • Design
    • Manufacturing
    • Applications
    • Components
    • Industry
    • MRO
  • MAGAZINE
    • Current Issue
    • Departments
    • Archives
    • Subscribe
    • Advertise
  • NEWSLETTER
  • VIDEO
    • Power Transmission Engineering TV
    • Webinars
  • BLOGS
    • Revolutions
    • Editors Choice
    • Motor Matters with George Holling
    • Bearings with Norm
  • BUYER'S GUIDE
  • NEWS and EVENTS
    • Product News
    • Industry News
    • Events
  • Advertising
    • Brand Awareness
      • Print: Display Advertising
      • Print: Engineering Showcase
      • Online: Web Banners & Keyword Banners
      • Online: Sponsored Content (Native Advertising)
      • E-mail: Custom, White Papers & Webinars
      • Email: Sponsored Content (Native Advertising)
    • Response & Lead Generation
      • E-Mail: Sponsored Content (Native Advertising)
      • E-mail: Newsletters
      • E-mail: Custom, White Papers & Webinars
      • Online: Buyers Guide
      • Online: Sponsored Content (Native Advertising)
    • Print
      • Print: Display Advertising
      • Print: Engineering Showcase
      • Print: MPT Expo Showstoppers (October 2023)
      • Print: Buyers Guide
      • Print: Engineering sMart
      • Print: Specifications
      • MPT Expo Show Guide Advertising
    • Online
      • Online: Web Banners and Keyword Banners
      • Online: Buyers Guide
      • Online: Sponsored Content (Native Advertising)
      • Online: Specifications
    • E-Mail
      • E-mail: Newsletters
      • E-mail: Custom, White Papers & Webinars
      • E-mail: Sponsored Content (Native Advertising)
      • E-mail: Specifications
    • Special Promotions
      • Print: Engineering Showcase
      • Print: Showstoppers (MPT Expo)
      • Print: Buyers Guide
      • Print: Engineering sMart
      • MPT Expo Show Guide Advertising
  • Contact Us
  • AGMA
    • Membership
    • Events
    • Education
    • Emerging Technology
    • AGMA Media
      • Gear Technology
      • Gear Technology India
    • Standards
Subscribe
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Home » Siemens Introduces Three-week Lead Time on Generation II 1FK7 Servomotors

Siemens Introduces Three-week Lead Time on Generation II 1FK7 Servomotors

March 2, 2015

Siemens Industry, Inc. recently announced a further reduction in lead times for Generation II of its Simotics 1FK7 servomotors. Highly-configurable to suit a wide variety of applications, this line features seven shaft heights, Quick-Connect power connectors and 20- and 24-bit field replaceable encoders in 10 styles, all combined with a three-week lead time. This new Siemens service applies to all motor models in the line, when ordered without gear box. 

The 1FK7 Generation II servomotors offer three inertia versions — standard, high-dynamic for rapid acceleration jobs and high-inertia for maximum smooth running. These motors are designed for operation without external cooling and the heat is dissipated through the motor surface. With 10 styles of field-replaceable encoders, the 1FK7 Generation II servomotors provide easy maintenance in the field, with reduced downtime and operating cost savings. A 10 percent improvement in continuous (S-1) power is achieved, since the encoders are mechanically and thermally decoupled from the motor. The mechanical decoupling also means the encoder is more resistant to vibration conditions on the machine. In addition, there is no need for battery back-up on the absolute encoders. 

Further, these 1FK7 Generation II servomotors provide users with 3x overload, 2.5 percent torque ripple, cross profiling for easier mounting, Siemens Drive-Cliq interface for easier field commissioning and unit recognition with the Siemens Sinamics S120 drive family, plain shaft or keyway design, three IP ratings and are supplied with or without holding brake.  

Product News
  • Related Articles

    Siemens Offers Three Week Delivery Time on 1FK7 Servomotors

    Siemens Reduces Lead Times for Servomotors

    Siemens Shortens Delivery Time on Servomotors

Free Power Transmission Engineering Subscriptions
Subscribe
Free Power Transmission Engineering Subscriptions
Subscribe
FEATURED VIDEO
  • Sugar Refinery Dryer Fan with NSK Europe
March 1, 2023
RECOMMENDED
  • First Impressions

    March 15, 2023
    IFPE6.jpg
  • Asset Management in Manufacturing

    February 7, 2023
    pt0223_Page_18_Image_0001.jpg
  • Vesconite Marine Rudder Bearings

    February 7, 2023
    pt0223_Page_28_Image_0001.jpg
  • The High Demands of Off-Highway Drive Systems

    March 21, 2023
    pt0323_Page_35_Image_0001.jpg
  • Making the Move to Digitalization and Electrification

    March 21, 2023
    pt0323_Page_25_Image_0002.jpg
  • The High Demands of Off-Highway Drive Systems

    March 21, 2023
    pt0323_Page_35_Image_0001.jpg
  • Making the Move to Digitalization and Electrification

    March 21, 2023
    pt0323_Page_25_Image_0002.jpg
  • First Impressions

    March 15, 2023
    IFPE6.jpg
  • Subscribe
  • Advertise
  • Contribute
  • Gear Technology
Powered byAGMA
Copyright © 2023 Power Transmission Engineering
  • Privacy Policy
  • Contact